Full MEP design and BIM coordination for a three-building technology campus in the Electronic City corridor.
Tech
A 38,000 m² corporate technology campus required coordinated MEP design across three interconnected buildings with shared central plant. We delivered the full MEP design from schematic through to construction documentation, coordinated in a federated Revit environment alongside the architect and structural engineers.
Where
Three Buildings, One Central Plant
Shared central plant across three blocks required every discipline to be coordinated at a campus level, not just building by building.
Data Centre Wing
A mission-critical wing within the campus required Tier II redundancy designed into the shared MEP infrastructure from concept.
Where
What
Campus-Wide Coordination
MEP routing between buildings and the central plant required a single coordinated model rather than three independent ones.
How
Central Plant First
Central plant was designed and locked in before individual building MEP, ensuring capacity and routing constraints were set at campus level.
What
Full MEP Design Package
Schematic through construction documentation for all three buildings and central plant.
Federated Revit Model
LOD 350 coordinated model covering all MEP disciplines.
What
What
“Getting three buildings and a central plant into one coordinated model before construction was exactly what we needed. Neutec made that feel straightforward.”
Head of Projects
Technology Firm
Proof
Data Centre Operator
Dubai, UAE · 2024
Data Centre
60%
RFI reduction vs portfolio average
2,400+
Clashes resolved pre-construction
5
Disciplines federated into one model
Federated BIM at LOD 400 for a tier-three hyperscale data centre in the Dubai Investment Park.
Manufacturing Firm
Pune, India · 2024
Industrial Facility
100%
Site captured in a single 3-day mobilisation
<1cm
Point cloud registration accuracy
0
Return site visits required
Point-cloud capture and as-built modelling for a 45,000 m² brownfield manufacturing plant.
Commercial Developer
London, UK · 2023
Commercial Tower
5
Project stages carried through one federated model
100%
COBie asset data delivered at handover
Live
BMS integration achieved from as-built model
Virtual design and construction programme for a 22-storey City of London office development.
Mixed-Use Developer
Singapore · 2023
Mixed-Use Development
18%
Cooling load reduction vs baseline
6
Atrium massing options simulated
LOD 350
Coordinated MEP model delivered clash-free
Computational fluid dynamics analysis and full MEP design for a mixed-use podium block in Marina Bay.
Financial Services Firm
Mumbai, India · 2023
Corporate HQ
18 wks
Concept to construction-issue
<40
Residual clashes across the building
100%
Design phases run in one shared model
Integrated MEP design and BIM coordination for a 14,000 m² corporate headquarters in BKC.
Real Estate Investment Group
Doha, Qatar · 2022
Mixed-Use Complex
5
Extension massing options evaluated
0
Tenant disruption during capture
Lawson
Criteria compliance achieved at podium level
Post-occupancy scan programme and wind comfort analysis for an existing mixed-use complex in West Bay.
Airport Authority
Riyadh, Saudi Arabia · 2024
Airport Terminal
3,800+
Clashes resolved pre-construction
7
MEP disciplines federated
62,000 m²
Terminal area coordinated
Full MEP coordination and BIM management for a new international terminal expansion at King Khalid Airport.
Healthcare Trust
Toronto, Canada · 2023
Hospital Complex
<60
Residual clashes at construction issue
7
Floors coordinated in one federated model
100%
HTM 03-01 HVAC compliance
Full MEP design and BIM coordination for a 320-bed acute care hospital expansion in downtown Toronto.
Residential Developer
Abu Dhabi, UAE · 2024
Residential Towers
51,000 m²
Twin-tower area coordinated
LOD 400
Delivered across both towers
0
Cross-tower coordination conflicts at issue
Federated architectural and MEP modelling for a twin-tower residential development on Abu Dhabi's Corniche.
Logistics Operator
Singapore · 2022
Logistics Hub
72,000 m²
Facility captured in one mobilisation
<1cm
Registration accuracy across the full site
0
Additional site visits required for phase 1 design
Reality capture and as-built modelling for a 72,000 m² logistics and distribution hub at Jurong.
University Estates
Manchester, UK · 2023
University Campus
100%
FM system import success at handover
LOD 500
As-built model delivered and verified
0
Manual asset entries required post-handover
BIM management and digital twin delivery for a new STEM faculty building on a live university campus.
Hospitality Group
Dubai, UAE · 2022
Hotel Tower
<30
Residual clashes at construction issue
420
Rooms coordinated to LOD 400
9 mo
Concept to construction issue
Integrated MEP design and BIM coordination for a 420-key luxury hotel tower in Dubai Marina.
Sports Authority
Cape Town, South Africa · 2023
Stadium
3,100+
Clashes resolved pre-construction
42,000
Seat capacity
LOD 400
Model fidelity
MEP coordination and clash detection for a 42,000-seat multi-purpose stadium in the Cape Winelands.