All Projects
13
VDC & Digital Twin

Tech 

Full MEP design and BIM coordination for a three-building technology campus in the Electronic City corridor.

/Overview
Tech Campus
SCAN 0%
ClientTechnology Firm
LocationBangalore, India
Year2023
Area38,000 m²
LODLOD 350
DisciplinesMechanical, Electrical, Plumbing, Data & Security

Tech 

A 38,000 m² corporate technology campus required coordinated MEP design across three interconnected buildings with shared central plant. We delivered the full MEP design from schematic through to construction documentation, coordinated in a federated Revit environment alongside the architect and structural engineers.

MEP DesignBIM Modeling
/Why They Needed Help

Where 

01

Three Buildings, One Central Plant

Shared central plant across three blocks required every discipline to be coordinated at a campus level, not just building by building.

02

Data Centre Wing

A mission-critical wing within the campus required Tier II redundancy designed into the shared MEP infrastructure from concept.

/Scope of Work

Where 

MEP DesignBIM Modeling
01
MEP Design (Schematic to Construction)
02
Federated BIM Coordination
03
Central Plant Design
/Key Project Challenges

What 

CH.01

Campus-Wide Coordination

MEP routing between buildings and the central plant required a single coordinated model rather than three independent ones.

/Execution Strategy

How 

Central Plant First

Central plant was designed and locked in before individual building MEP, ensuring capacity and routing constraints were set at campus level.

01
/Solution Delivered

What 

Layer 01

Full MEP Design Package

Schematic through construction documentation for all three buildings and central plant.

Layer 02

Federated Revit Model

LOD 350 coordinated model covering all MEP disciplines.

01
02
/Business Impact

What 

0Campus gross area
0Model fidelity
0Buildings coordinated
/Tools Used

What 

R
Autodesk RevitBIM Authoring
N
Navisworks ManageModel Coordination
B
BIM 360Cloud Collaboration
/Client Testimonial

Getting three buildings and a central plant into one coordinated model before construction was exactly what we needed. Neutec made that feel straightforward.

Head of Projects

Technology Firm

/Case Studies

Proof 

Data Centre Operator

Dubai, UAE · 2024

Data Centre

60%

RFI reduction vs portfolio average

2,400+

Clashes resolved pre-construction

5

Disciplines federated into one model

Federated BIM at LOD 400 for a tier-three hyperscale data centre in the Dubai Investment Park.

Manufacturing Firm

Pune, India · 2024

Industrial Facility

100%

Site captured in a single 3-day mobilisation

<1cm

Point cloud registration accuracy

0

Return site visits required

Point-cloud capture and as-built modelling for a 45,000 m² brownfield manufacturing plant.

Commercial Developer

London, UK · 2023

Commercial Tower

5

Project stages carried through one federated model

100%

COBie asset data delivered at handover

Live

BMS integration achieved from as-built model

Virtual design and construction programme for a 22-storey City of London office development.

Mixed-Use Developer

Singapore · 2023

Mixed-Use Development

18%

Cooling load reduction vs baseline

6

Atrium massing options simulated

LOD 350

Coordinated MEP model delivered clash-free

Computational fluid dynamics analysis and full MEP design for a mixed-use podium block in Marina Bay.

Financial Services Firm

Mumbai, India · 2023

Corporate HQ

18 wks

Concept to construction-issue

<40

Residual clashes across the building

100%

Design phases run in one shared model

Integrated MEP design and BIM coordination for a 14,000 m² corporate headquarters in BKC.

Real Estate Investment Group

Doha, Qatar · 2022

Mixed-Use Complex

5

Extension massing options evaluated

0

Tenant disruption during capture

Lawson

Criteria compliance achieved at podium level

Post-occupancy scan programme and wind comfort analysis for an existing mixed-use complex in West Bay.

Airport Authority

Riyadh, Saudi Arabia · 2024

Airport Terminal

3,800+

Clashes resolved pre-construction

7

MEP disciplines federated

62,000 m²

Terminal area coordinated

Full MEP coordination and BIM management for a new international terminal expansion at King Khalid Airport.

Healthcare Trust

Toronto, Canada · 2023

Hospital Complex

<60

Residual clashes at construction issue

7

Floors coordinated in one federated model

100%

HTM 03-01 HVAC compliance

Full MEP design and BIM coordination for a 320-bed acute care hospital expansion in downtown Toronto.

Residential Developer

Abu Dhabi, UAE · 2024

Residential Towers

51,000 m²

Twin-tower area coordinated

LOD 400

Delivered across both towers

0

Cross-tower coordination conflicts at issue

Federated architectural and MEP modelling for a twin-tower residential development on Abu Dhabi's Corniche.

Logistics Operator

Singapore · 2022

Logistics Hub

72,000 m²

Facility captured in one mobilisation

<1cm

Registration accuracy across the full site

0

Additional site visits required for phase 1 design

Reality capture and as-built modelling for a 72,000 m² logistics and distribution hub at Jurong.

University Estates

Manchester, UK · 2023

University Campus

100%

FM system import success at handover

LOD 500

As-built model delivered and verified

0

Manual asset entries required post-handover

BIM management and digital twin delivery for a new STEM faculty building on a live university campus.

Hospitality Group

Dubai, UAE · 2022

Hotel Tower

<30

Residual clashes at construction issue

420

Rooms coordinated to LOD 400

9 mo

Concept to construction issue

Integrated MEP design and BIM coordination for a 420-key luxury hotel tower in Dubai Marina.

Sports Authority

Cape Town, South Africa · 2023

Stadium

3,100+

Clashes resolved pre-construction

42,000

Seat capacity

LOD 400

Model fidelity

MEP coordination and clash detection for a 42,000-seat multi-purpose stadium in the Cape Winelands.

/FAQ

Questions 

LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·

Have 

Tell us what you’re building. We’ll show you how we’d approach it.

Start a Project