All Projects
08
Healthcare MEP Design

Hospital 

Full MEP design and BIM coordination for a 320-bed acute care hospital expansion in downtown Toronto.

/Overview
Hospital Complex
SCAN 0%
ClientHealthcare Trust
LocationToronto, Canada
Year2023
Area24,000 m²
LODLOD 350
DisciplinesMechanical, Electrical, Plumbing, Medical Gas, Emergency Power

Hospital 

A healthcare trust expanding its acute care capacity required full MEP design from schematic through to construction documentation, coordinated against a complex brief covering surgical suites, intensive care, and general wards across seven floors.

MEP design was delivered in a shared Revit environment alongside the architect and structural engineer, with infection-control zoning, medical gas systems, and emergency power redundancy designed as integrated constraints from concept stage. The coordinated model reached construction issue with under 60 residual clashes across the entire facility.

MEP DesignBIM Coordination
/Why They Needed Help

Where 

01

Infection Control Was Non-Negotiable

Surgical and ICU zones required HVAC pressure cascades that couldn't be compromised by routing decisions made in isolation.

02

Medical Gas Added a Layer of Complexity

Oxygen, nitrous oxide, and medical air systems had to be coordinated against fire-compartment boundaries and structural elements throughout.

03

Emergency Power Redundancy Required Full Model Visibility

N+1 emergency power routing had to be verified across the entire facility before construction, not at handover.

04

Healthcare Programme Had Zero Float

The trust's bed-capacity plan depended on the expansion completing on programme, with no schedule contingency for late-stage clashes.

/Scope of Work

Where 

MEP DesignBIM Coordination
01
Full MEP Design (Schematic to Construction Issue)
02
Medical Gas System Design
03
Emergency Power Redundancy Engineering
04
Infection Control HVAC Zoning
/Key Project Challenges

What 

CH.01

Infection Control Pressure Cascades

Surgical and ICU HVAC pressure relationships had to be maintained as a hard constraint throughout coordination, with no exceptions.

CH.02

Medical Gas Routing Across Compartments

Medical gas distribution had to navigate fire-compartment boundaries without compromising either the gas system or the compartmentation.

CH.03

Seven-Floor Coordination

Stacked clinical and support spaces across seven floors created a coordination challenge where decisions on one level regularly propagated upward.

CH.04

COBie at Handover

A complete COBie dataset had to be structured into the model throughout delivery, covering every asset the FM team would manage from day one.

/Execution Strategy

How 

Zone Before Routing

Infection-control and fire-compartment zones were modelled as spatial constraints in the federated environment before any MEP routing was attempted.

01
02

Integrate Medical Gas from Concept

Medical gas design was integrated into the MEP model from schematic stage, not added as a separate overlay after the other systems were already routed.

Verify Emergency Power Across the Whole Building

N+1 routing was checked against the full federated model to confirm redundancy paths were maintained across all seven floors.

03
04

Build COBie In, Not On

COBie data was structured into the model throughout the design phase so the FM handover package was complete without a separate data-extraction exercise.

/Solution Delivered

What 

Layer 01

MEP Design Package

Full mechanical, electrical, plumbing, and medical gas design from schematic through to construction-issue drawings.

Layer 02

Infection Control HVAC Report

Pressure-cascade zoning report covering all surgical and ICU areas against HTM 03-01 requirements.

Layer 03

Emergency Power Layout

N+1 emergency power routing plan coordinated against the structural and architectural models.

Layer 04

Coordinated BIM Model

LOD 350 federated model issued clash-free for construction, with COBie data structured for FM handover.

01
04
/Business Impact

What 

0Residual clashes at construction issue
0Floors coordinated in one federated model
0HTM 03-01 HVAC compliance
0FM-ready data package at handover
/Tools Used

What 

R
Autodesk RevitBIM Authoring
N
Navisworks ManageModel Coordination
I
IES VESimulation
B
BIM 360Cloud Collaboration
/Client Testimonial

Infection control zoning and medical gas routing are the kind of constraints that break a coordination programme if they're not treated as first-class constraints from day one. Neutec got that right.

Capital Projects Director

Healthcare Trust

/Case Studies

Proof 

Data Centre Operator

Dubai, UAE · 2024

Data Centre

60%

RFI reduction vs portfolio average

2,400+

Clashes resolved pre-construction

5

Disciplines federated into one model

Federated BIM at LOD 400 for a tier-three hyperscale data centre in the Dubai Investment Park.

Manufacturing Firm

Pune, India · 2024

Industrial Facility

100%

Site captured in a single 3-day mobilisation

<1cm

Point cloud registration accuracy

0

Return site visits required

Point-cloud capture and as-built modelling for a 45,000 m² brownfield manufacturing plant.

Commercial Developer

London, UK · 2023

Commercial Tower

5

Project stages carried through one federated model

100%

COBie asset data delivered at handover

Live

BMS integration achieved from as-built model

Virtual design and construction programme for a 22-storey City of London office development.

Mixed-Use Developer

Singapore · 2023

Mixed-Use Development

18%

Cooling load reduction vs baseline

6

Atrium massing options simulated

LOD 350

Coordinated MEP model delivered clash-free

Computational fluid dynamics analysis and full MEP design for a mixed-use podium block in Marina Bay.

Financial Services Firm

Mumbai, India · 2023

Corporate HQ

18 wks

Concept to construction-issue

<40

Residual clashes across the building

100%

Design phases run in one shared model

Integrated MEP design and BIM coordination for a 14,000 m² corporate headquarters in BKC.

Real Estate Investment Group

Doha, Qatar · 2022

Mixed-Use Complex

5

Extension massing options evaluated

0

Tenant disruption during capture

Lawson

Criteria compliance achieved at podium level

Post-occupancy scan programme and wind comfort analysis for an existing mixed-use complex in West Bay.

Airport Authority

Riyadh, Saudi Arabia · 2024

Airport Terminal

3,800+

Clashes resolved pre-construction

7

MEP disciplines federated

62,000 m²

Terminal area coordinated

Full MEP coordination and BIM management for a new international terminal expansion at King Khalid Airport.

Residential Developer

Abu Dhabi, UAE · 2024

Residential Towers

51,000 m²

Twin-tower area coordinated

LOD 400

Delivered across both towers

0

Cross-tower coordination conflicts at issue

Federated architectural and MEP modelling for a twin-tower residential development on Abu Dhabi's Corniche.

Logistics Operator

Singapore · 2022

Logistics Hub

72,000 m²

Facility captured in one mobilisation

<1cm

Registration accuracy across the full site

0

Additional site visits required for phase 1 design

Reality capture and as-built modelling for a 72,000 m² logistics and distribution hub at Jurong.

University Estates

Manchester, UK · 2023

University Campus

100%

FM system import success at handover

LOD 500

As-built model delivered and verified

0

Manual asset entries required post-handover

BIM management and digital twin delivery for a new STEM faculty building on a live university campus.

Hospitality Group

Dubai, UAE · 2022

Hotel Tower

<30

Residual clashes at construction issue

420

Rooms coordinated to LOD 400

9 mo

Concept to construction issue

Integrated MEP design and BIM coordination for a 420-key luxury hotel tower in Dubai Marina.

Technology Firm

Bangalore, India · 2023

Tech Campus

38,000 m²

Campus gross area

LOD 350

Model fidelity

3

Buildings coordinated

Full MEP design and BIM coordination for a three-building technology campus in the Electronic City corridor.

Sports Authority

Cape Town, South Africa · 2023

Stadium

3,100+

Clashes resolved pre-construction

42,000

Seat capacity

LOD 400

Model fidelity

MEP coordination and clash detection for a 42,000-seat multi-purpose stadium in the Cape Winelands.