All Projects
12
MEP Design & BIM

Hotel 

Integrated MEP design and BIM coordination for a 420-key luxury hotel tower in Dubai Marina.

/Overview
Hotel Tower
SCAN 0%
ClientHospitality Group
LocationDubai, UAE
Year2022
Area43,000 m²
LODLOD 400
DisciplinesMechanical, Electrical, Plumbing, Building Automation, AV/IT

Hotel 

A hospitality group developing a 420-key luxury hotel tower required full MEP design from concept through to construction documentation, with BIM coordination embedded into the design process throughout. We designed the mechanical, electrical, and plumbing systems in parallel with the architectural and structural teams, coordinating in a shared Revit environment from schematic stage.

The hotel programme was accelerated by the client's opening target, requiring MEP design, clash coordination, and construction documentation to progress concurrently rather than sequentially. Continuous coordination through the nine-month design programme kept the model construction-ready at each stage gate, with fewer than 30 residual clashes at construction issue.

MEP DesignBIM Coordination
/Why They Needed Help

Where 

01

Nine-Month Design Programme Was Fixed

The hotel opening date was set, leaving a nine-month window for MEP design that assumed parallel rather than sequential delivery.

02

Guest Room MEP Required Millimetre Precision

Luxury fit-out tolerances in guest rooms meant MEP routing had to be confirmed at LOD 400 before ceiling and wall linings were specified.

03

Building Automation Required Integration from Concept

A fully integrated BAS couldn't be added as a late-stage overlay — it had to be designed into the MEP systems from the outset.

04

Accelerated Programme Had No Room for Rework

With every design phase compressed, a single late-stage coordination failure could push back the construction start and the opening date.

/Scope of Work

Where 

MEP DesignBIM Coordination
01
Concept-to-Construction MEP Design
02
Building Automation System Design
03
Continuous BIM Coordination
04
Accelerated Construction Documentation
/Key Project Challenges

What 

CH.01

Parallel Design and Documentation

MEP design, BIM coordination, and construction documentation ran concurrently rather than sequentially, requiring careful version control across all three workstreams.

CH.02

Luxury Finish Tolerances

Guest room ceiling and wall lining specifications required LOD 400 MEP geometry to confirm clearances before interior finishes were locked in.

CH.03

BAS Integration Across All Zones

Building automation had to be coordinated against mechanical, electrical, and AV systems across 420 rooms plus all back-of-house areas simultaneously.

CH.04

Residual Clash Target

The client required a construction-issue model under 30 residual clashes — a tight bar for a 43,000 m² tower on a nine-month programme.

/Execution Strategy

How 

Design and Coordinate in Parallel

MEP design and BIM coordination ran as one concurrent workstream from schematic stage, with documentation following rather than waiting for design to complete.

01
02

LOD 400 Guest Rooms First

Guest room MEP was taken to LOD 400 early in the programme, ahead of the rest of the tower, so interior specifications could be locked in without coordination risk.

Integrate BAS from Concept

Building automation was designed into the MEP systems at schematic stage rather than connected as a late-stage overlay.

03
04

Issue Continuously, Not at Stage Gates

Coordination reports and partial documentation packages were issued continuously through the design programme rather than batched for stage-gate reviews.

/Solution Delivered

What 

Layer 01

MEP Design Package

Full mechanical, electrical, and plumbing design from concept through to construction-issue drawings and specifications.

Layer 02

BAS Integration Design

Building automation system designed and coordinated against the MEP model from schematic stage.

Layer 03

LOD 400 Coordination Model

Federated LOD 400 MEP model issued clash-free for construction across all hotel zones.

Layer 04

Guest Room MEP Packages

Room-by-room MEP issue sheets coordinated against the architectural interior specification.

01
04
/Business Impact

What 

0Residual clashes at construction issue
0Rooms coordinated to LOD 400
0Concept to construction issue
0Building automation integrated from concept
/Tools Used

What 

R
Autodesk RevitBIM Authoring
N
Navisworks ManageModel Coordination
B
BIM 360Cloud Collaboration
B
BIMcollab BCFIssue Tracking
/Client Testimonial

Fewer than 30 clashes on a 420-key tower built in nine months. We've never hit that number before on a project this complex. Neutec's coordination discipline made it possible.

Project Director

Hospitality Group

/Case Studies

Proof 

Data Centre Operator

Dubai, UAE · 2024

Data Centre

60%

RFI reduction vs portfolio average

2,400+

Clashes resolved pre-construction

5

Disciplines federated into one model

Federated BIM at LOD 400 for a tier-three hyperscale data centre in the Dubai Investment Park.

Manufacturing Firm

Pune, India · 2024

Industrial Facility

100%

Site captured in a single 3-day mobilisation

<1cm

Point cloud registration accuracy

0

Return site visits required

Point-cloud capture and as-built modelling for a 45,000 m² brownfield manufacturing plant.

Commercial Developer

London, UK · 2023

Commercial Tower

5

Project stages carried through one federated model

100%

COBie asset data delivered at handover

Live

BMS integration achieved from as-built model

Virtual design and construction programme for a 22-storey City of London office development.

Mixed-Use Developer

Singapore · 2023

Mixed-Use Development

18%

Cooling load reduction vs baseline

6

Atrium massing options simulated

LOD 350

Coordinated MEP model delivered clash-free

Computational fluid dynamics analysis and full MEP design for a mixed-use podium block in Marina Bay.

Financial Services Firm

Mumbai, India · 2023

Corporate HQ

18 wks

Concept to construction-issue

<40

Residual clashes across the building

100%

Design phases run in one shared model

Integrated MEP design and BIM coordination for a 14,000 m² corporate headquarters in BKC.

Real Estate Investment Group

Doha, Qatar · 2022

Mixed-Use Complex

5

Extension massing options evaluated

0

Tenant disruption during capture

Lawson

Criteria compliance achieved at podium level

Post-occupancy scan programme and wind comfort analysis for an existing mixed-use complex in West Bay.

Airport Authority

Riyadh, Saudi Arabia · 2024

Airport Terminal

3,800+

Clashes resolved pre-construction

7

MEP disciplines federated

62,000 m²

Terminal area coordinated

Full MEP coordination and BIM management for a new international terminal expansion at King Khalid Airport.

Healthcare Trust

Toronto, Canada · 2023

Hospital Complex

<60

Residual clashes at construction issue

7

Floors coordinated in one federated model

100%

HTM 03-01 HVAC compliance

Full MEP design and BIM coordination for a 320-bed acute care hospital expansion in downtown Toronto.

Residential Developer

Abu Dhabi, UAE · 2024

Residential Towers

51,000 m²

Twin-tower area coordinated

LOD 400

Delivered across both towers

0

Cross-tower coordination conflicts at issue

Federated architectural and MEP modelling for a twin-tower residential development on Abu Dhabi's Corniche.

Logistics Operator

Singapore · 2022

Logistics Hub

72,000 m²

Facility captured in one mobilisation

<1cm

Registration accuracy across the full site

0

Additional site visits required for phase 1 design

Reality capture and as-built modelling for a 72,000 m² logistics and distribution hub at Jurong.

University Estates

Manchester, UK · 2023

University Campus

100%

FM system import success at handover

LOD 500

As-built model delivered and verified

0

Manual asset entries required post-handover

BIM management and digital twin delivery for a new STEM faculty building on a live university campus.

Technology Firm

Bangalore, India · 2023

Tech Campus

38,000 m²

Campus gross area

LOD 350

Model fidelity

3

Buildings coordinated

Full MEP design and BIM coordination for a three-building technology campus in the Electronic City corridor.

Sports Authority

Cape Town, South Africa · 2023

Stadium

3,100+

Clashes resolved pre-construction

42,000

Seat capacity

LOD 400

Model fidelity

MEP coordination and clash detection for a 42,000-seat multi-purpose stadium in the Cape Winelands.

/FAQ

Questions 

LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·

Have 

Tell us what you’re building. We’ll show you how we’d approach it.

Start a Project