Stadium
MEP coordination and clash detection for a 42,000-seat multi-purpose stadium in the Cape Winelands.
Stadium.
A new multi-purpose stadium required MEP coordination across six disciplines in a complex structure with long-span roof systems and high-density crowd-safety services. We managed the federated BIM environment across all design stages, running weekly coordination sessions and resolving over 3,100 clashes before construction commenced.
Where
Long-Span Roof Complexity
The roof structure left severely constrained MEP zones with no tolerance for unresolved clashes at construction stage.
Crowd Safety Systems
Fire suppression, PA, and emergency lighting had to be coordinated with structural and architectural constraints at high density.
Where
What
Roof Zone Constraints
Long-span structure left minimal MEP zones — every route required sign-off from structural before it could be locked.
How
Structural-First Coordination
MEP routing was not started until structural model was frozen at LOD 350, preventing wasted coordination work.
What
Federated MEP Model
LOD 400 model covering all six MEP disciplines.
Clash Detection Reports
Weekly BCF reports with over 3,100 issues resolved pre-construction.
What
What
“A stadium roof with that level of MEP density could have been a disaster without proper coordination. Neutec got us to construction with confidence.”
Project Manager
Sports Authority
Proof
Data Centre Operator
Dubai, UAE · 2024
Data Centre
60%
RFI reduction vs portfolio average
2,400+
Clashes resolved pre-construction
5
Disciplines federated into one model
Federated BIM at LOD 400 for a tier-three hyperscale data centre in the Dubai Investment Park.
Manufacturing Firm
Pune, India · 2024
Industrial Facility
100%
Site captured in a single 3-day mobilisation
<1cm
Point cloud registration accuracy
0
Return site visits required
Point-cloud capture and as-built modelling for a 45,000 m² brownfield manufacturing plant.
Commercial Developer
London, UK · 2023
Commercial Tower
5
Project stages carried through one federated model
100%
COBie asset data delivered at handover
Live
BMS integration achieved from as-built model
Virtual design and construction programme for a 22-storey City of London office development.
Mixed-Use Developer
Singapore · 2023
Mixed-Use Development
18%
Cooling load reduction vs baseline
6
Atrium massing options simulated
LOD 350
Coordinated MEP model delivered clash-free
Computational fluid dynamics analysis and full MEP design for a mixed-use podium block in Marina Bay.
Financial Services Firm
Mumbai, India · 2023
Corporate HQ
18 wks
Concept to construction-issue
<40
Residual clashes across the building
100%
Design phases run in one shared model
Integrated MEP design and BIM coordination for a 14,000 m² corporate headquarters in BKC.
Real Estate Investment Group
Doha, Qatar · 2022
Mixed-Use Complex
5
Extension massing options evaluated
0
Tenant disruption during capture
Lawson
Criteria compliance achieved at podium level
Post-occupancy scan programme and wind comfort analysis for an existing mixed-use complex in West Bay.
Airport Authority
Riyadh, Saudi Arabia · 2024
Airport Terminal
3,800+
Clashes resolved pre-construction
7
MEP disciplines federated
62,000 m²
Terminal area coordinated
Full MEP coordination and BIM management for a new international terminal expansion at King Khalid Airport.
Healthcare Trust
Toronto, Canada · 2023
Hospital Complex
<60
Residual clashes at construction issue
7
Floors coordinated in one federated model
100%
HTM 03-01 HVAC compliance
Full MEP design and BIM coordination for a 320-bed acute care hospital expansion in downtown Toronto.
Residential Developer
Abu Dhabi, UAE · 2024
Residential Towers
51,000 m²
Twin-tower area coordinated
LOD 400
Delivered across both towers
0
Cross-tower coordination conflicts at issue
Federated architectural and MEP modelling for a twin-tower residential development on Abu Dhabi's Corniche.
Logistics Operator
Singapore · 2022
Logistics Hub
72,000 m²
Facility captured in one mobilisation
<1cm
Registration accuracy across the full site
0
Additional site visits required for phase 1 design
Reality capture and as-built modelling for a 72,000 m² logistics and distribution hub at Jurong.
University Estates
Manchester, UK · 2023
University Campus
100%
FM system import success at handover
LOD 500
As-built model delivered and verified
0
Manual asset entries required post-handover
BIM management and digital twin delivery for a new STEM faculty building on a live university campus.
Hospitality Group
Dubai, UAE · 2022
Hotel Tower
<30
Residual clashes at construction issue
420
Rooms coordinated to LOD 400
9 mo
Concept to construction issue
Integrated MEP design and BIM coordination for a 420-key luxury hotel tower in Dubai Marina.
Technology Firm
Bangalore, India · 2023
Tech Campus
38,000 m²
Campus gross area
LOD 350
Model fidelity
3
Buildings coordinated
Full MEP design and BIM coordination for a three-building technology campus in the Electronic City corridor.