All Projects
01
Mission-Critical Infrastructure

Data 

Federated BIM at LOD 400 for a tier-three hyperscale data centre in the Dubai Investment Park.

/Overview
Data Centre
SCAN 0%
ClientData Centre Operator
LocationDubai, UAE
Year2024
Area28,000 m²
LODLOD 400
DisciplinesMechanical, Electrical, Plumbing, Fire Suppression, Structured Cabling

Data 

A 28,000 m² mission-critical facility designed to meet Tier III uptime standards. Our scope covered full MEP coordination across five disciplines — power, cooling, fire suppression, structured cabling, and security systems — delivered as a single federated Revit model at LOD 400.

Clash detection cycles were run weekly against the structural and architectural models, resolving over 2,400 issues before construction commenced. The coordinated model became the primary reference for the mechanical and electrical contractors throughout the build phase, reducing RFIs by an estimated 60% against the project average.

BIM ModelingMEP Coordination
/Why They Needed Help

Where 

01

No Single Source of Truth

Five MEP disciplines were being modelled by separate subcontractors with no federated environment, so nothing could be trusted until it was manually cross-checked.

02

Uptime Left No Room for Error

Tier III redundancy requirements meant a single unresolved clash could compromise N+1 resilience once construction began.

03

RFI Volume Was Eating the Programme

Early coordination gaps were generating enough RFIs to threaten the construction schedule before ground had even broken.

04

No In-House Coordination Capacity

The operator's own team had the operational expertise but not the modelling bandwidth to run federated coordination in-house.

/Scope of Work

Where 

BIM ModelingMEP Coordination
01
Federated MEP Modelling (LOD 400)
02
Multi-Discipline Clash Detection
03
BIM Execution Plan Authoring
04
Construction-Issue Coordination
/Key Project Challenges

What 

CH.01

Five Disciplines, One Model

Power, cooling, fire suppression, structured cabling, and security all had to resolve inside a single federated model without any discipline compromising another's routing.

CH.02

Tier III Uptime Tolerance

Redundant systems left almost no spatial slack — every reroute had to preserve N+1 resilience paths across the entire facility.

CH.03

Weekly Clash Cadence Under Pressure

Running clash cycles weekly against a live structural model meant issues had to be triaged and closed before the next design freeze, not batched for later.

CH.04

RFI Reduction Target

Contractors needed a model clean enough to build from directly, since the project's RFI budget assumed a 60% reduction against the portfolio average.

/Execution Strategy

How 

Federate & Baseline

All five MEP disciplines were brought into a single federated Revit environment against the architectural and structural baseline before any routing began.

01
02

Coordinate Weekly

Structured clash-detection cycles ran every week, with BCF issues assigned directly to discipline leads rather than surfaced only at milestone reviews.

Resolve at Source

Over 2,400 clashes were closed by adjusting routing at the modelling stage, keeping the federated model itself as the single point of resolution.

03
04

Hand Off Construction-Ready

Discipline-specific issue sheets were issued directly to site, coordinated against the structural model so contractors could build without further clarification.

/Solution Delivered

What 

Layer 01

Federated MEP Model

LOD 400 model covering all five MEP disciplines, authored to the project BEP and employer's information requirements.

Layer 02

Clash Detection Reports

Weekly BCF-based clash reports with issue ownership assigned to discipline leads. Over 2,400 clashes resolved pre-construction.

Layer 03

BIM Execution Plan

Project-specific BEP written to ISO 19650-2, covering naming, exchange formats, model progression, and responsibility matrix.

Layer 04

Construction Issue Sheets

Discipline-specific issue sheets coordinated with the structural model, used directly by contractors on site.

01
04
/Business Impact

What 

0RFI reduction vs portfolio average
0Clashes resolved pre-construction
0Disciplines federated into one model
0Tier III N+1 compliance maintained
/Tools Used

What 

R
Autodesk RevitBIM Authoring
N
Navisworks ManageModel Coordination
B
BIM 360Cloud Collaboration
B
BIMcollab BCFIssue Tracking
/Client Testimonial

Neutec's coordination model became the one document every contractor trusted on site. We went into construction with confidence we hadn't had on a data centre project before.

Facilities Director

Data Centre Operator

/Case Studies

Proof 

Manufacturing Firm

Pune, India · 2024

Industrial Facility

100%

Site captured in a single 3-day mobilisation

<1cm

Point cloud registration accuracy

0

Return site visits required

Point-cloud capture and as-built modelling for a 45,000 m² brownfield manufacturing plant.

Commercial Developer

London, UK · 2023

Commercial Tower

5

Project stages carried through one federated model

100%

COBie asset data delivered at handover

Live

BMS integration achieved from as-built model

Virtual design and construction programme for a 22-storey City of London office development.

Mixed-Use Developer

Singapore · 2023

Mixed-Use Development

18%

Cooling load reduction vs baseline

6

Atrium massing options simulated

LOD 350

Coordinated MEP model delivered clash-free

Computational fluid dynamics analysis and full MEP design for a mixed-use podium block in Marina Bay.

Financial Services Firm

Mumbai, India · 2023

Corporate HQ

18 wks

Concept to construction-issue

<40

Residual clashes across the building

100%

Design phases run in one shared model

Integrated MEP design and BIM coordination for a 14,000 m² corporate headquarters in BKC.

Real Estate Investment Group

Doha, Qatar · 2022

Mixed-Use Complex

5

Extension massing options evaluated

0

Tenant disruption during capture

Lawson

Criteria compliance achieved at podium level

Post-occupancy scan programme and wind comfort analysis for an existing mixed-use complex in West Bay.

Airport Authority

Riyadh, Saudi Arabia · 2024

Airport Terminal

3,800+

Clashes resolved pre-construction

7

MEP disciplines federated

62,000 m²

Terminal area coordinated

Full MEP coordination and BIM management for a new international terminal expansion at King Khalid Airport.

Healthcare Trust

Toronto, Canada · 2023

Hospital Complex

<60

Residual clashes at construction issue

7

Floors coordinated in one federated model

100%

HTM 03-01 HVAC compliance

Full MEP design and BIM coordination for a 320-bed acute care hospital expansion in downtown Toronto.

Residential Developer

Abu Dhabi, UAE · 2024

Residential Towers

51,000 m²

Twin-tower area coordinated

LOD 400

Delivered across both towers

0

Cross-tower coordination conflicts at issue

Federated architectural and MEP modelling for a twin-tower residential development on Abu Dhabi's Corniche.

Logistics Operator

Singapore · 2022

Logistics Hub

72,000 m²

Facility captured in one mobilisation

<1cm

Registration accuracy across the full site

0

Additional site visits required for phase 1 design

Reality capture and as-built modelling for a 72,000 m² logistics and distribution hub at Jurong.

University Estates

Manchester, UK · 2023

University Campus

100%

FM system import success at handover

LOD 500

As-built model delivered and verified

0

Manual asset entries required post-handover

BIM management and digital twin delivery for a new STEM faculty building on a live university campus.

Hospitality Group

Dubai, UAE · 2022

Hotel Tower

<30

Residual clashes at construction issue

420

Rooms coordinated to LOD 400

9 mo

Concept to construction issue

Integrated MEP design and BIM coordination for a 420-key luxury hotel tower in Dubai Marina.

Technology Firm

Bangalore, India · 2023

Tech Campus

38,000 m²

Campus gross area

LOD 350

Model fidelity

3

Buildings coordinated

Full MEP design and BIM coordination for a three-building technology campus in the Electronic City corridor.

Sports Authority

Cape Town, South Africa · 2023

Stadium

3,100+

Clashes resolved pre-construction

42,000

Seat capacity

LOD 400

Model fidelity

MEP coordination and clash detection for a 42,000-seat multi-purpose stadium in the Cape Winelands.

/FAQ

Questions 

LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·

Have 

Tell us what you’re building. We’ll show you how we’d approach it.

Start a Project