Infrastructure
Federated coordination for the assets a city can't do without.
Public infrastructure, coordinated at the scale it demands.
Transport and civil infrastructure programmes carry constraints most buildings never see — hard zoning boundaries, fixed authority deadlines, and a passenger or public-safety load that leaves zero tolerance for a routing conflict discovered on site. We manage federated MEP and structural coordination across every discipline the programme needs, from HVAC and baggage systems through fire suppression and security, in one shared environment.
Weekly coordination cycles keep pace with an accelerated construction schedule, and clash detection runs continuously against the live structural model rather than in batched end-of-stage reviews — because on an infrastructure programme, a schedule slip has consequences well beyond the project itself.
3,800+
Clashes resolved pre-construction on a single terminal programme
0
MEP disciplines federated into one coordination model
62,000 m²
Terminal area coordinated to LOD 400
Every
Public Authorities & Operators
Serving transport authorities, airport operators, and public infrastructure owners.
Design & Engineering Consultants
Serving civil, structural, and MEP design consultants.
Operations & Facilities Teams
Serving operators taking on live-system handover.
01
Public Authorities & Operators
Serving transport authorities, airport operators, and public infrastructure owners.
02
Design & Engineering Consultants
Serving civil, structural, and MEP design consultants.
03
Operations & Facilities Teams
Serving operators taking on live-system handover.
The constraints we design around.
Multi-Discipline Federation at Scale
HVAC, electrical, plumbing, fire, baggage, security, and AV all have to resolve inside one federated model without any single discipline compromising another.
Hard Zoning Boundaries
Security and operational zoning imposes spatial constraints on routing that can't be overridden, regardless of coordination convenience.
Authority-Fixed Deadlines
Programme timelines are typically set by an external authority, leaving no schedule float for late-stage clash resolution.
Live Operations Handover
As-built models need structuring and attribution specific enough to integrate directly with an operator's live systems from day one, not a static package.
One discipline, applied consistently.
Federate Every Discipline
HVAC, electrical, fire, baggage, security, and AV are brought into one coordination environment from day one.
Federate Every Discipline
HVAC, electrical, fire, baggage, security, and AV are brought into one coordination environment from day one.
Model Zoning as Constraints
Security and operational boundaries are built in before any routing begins.
Triage Weekly Under Pressure
Clash reports are issued weekly with named ownership to keep pace with fixed deadlines.
Hand Off Live-System Ready
As-built models are structured to integrate directly with the operator's live systems.
3,800+
Clashes resolved pre-construction on a single terminal programme
0
MEP disciplines federated into one model
Weekly
Clash-triage cadence under authority deadlines
62,000 m²
Terminal area coordinated to LOD 400
What sets this apart.
Seven consultants and a hard authority deadline is not an unusual brief on an infrastructure programme. We keep every discipline inside one model and get to construction without a routing conflict.
Talk to usFull-discipline federation
Every MEP discipline the programme needs is coordinated inside one shared environment, not managed as separate consultant silos.
Zoning modelled as hard constraints
Security and operational boundaries are built into the coordination environment from day one, so routing never crosses them by accident.
Weekly triage under pressure
Clash reports are issued weekly with named discipline ownership, keeping resolution on pace with fixed authority deadlines.
Live-system handover structuring
As-built models are attributed throughout delivery to meet operator live-integration requirements at handover.
“We had seven consultants and a hard aviation-authority deadline. Neutec kept every discipline inside one model and got us to construction without a single airside routing conflict.”
Programme Director
Airport Authority