A CDE is more than a shared folder with permissions. Get the naming conventions and workflow states wrong early, and every team pays for it later.

Setting up a Common Data Environment is one of those tasks that looks straightforward and turns out not to be. The software is rarely the problem. The problems are almost always in the decisions made before anyone logs into the platform — and those decisions are much harder to reverse once the project is live.

The first thing teams overlook is the naming convention. A naming convention that is not aligned across all discipline teams from day one means that every file exchange requires manual translation. That translation work accumulates invisibly until it becomes a source of delay, version confusion, and — eventually — someone working from the wrong revision.

The second is workflow states. Most CDE platforms support some version of a four-state workflow: Work In Progress, Shared, Published, and Archived. What those states actually mean — who can move a file between them, what review is required, and what obligations are triggered — needs to be written into the BEP before the first file is uploaded, not discovered through trial and error during Stage 3.

Third: access control. It is tempting to give everyone broad access to simplify setup. The consequence is that discipline leads cannot control who is working from their current files versus previous revisions. Structured access control, aligned with the project's information originator matrix, is the thing that makes a CDE actually function as a source of truth rather than a shared drive with a better interface.

Fourth: the revision numbering scheme. If one consultant is using letters and another is using numbers, and a third is using both, a coordinator cannot tell at a glance which file is current. Fifth — and most commonly overlooked — is the handover structure. The CDE setup that supports design coordination is almost never the same structure that an FM team can navigate. That transition needs to be planned in the BEP, not improvised at practical completion.

N

Neutec BIM Consulting Team

Neutec · Feb 2024

LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·

Have 

Tell us what you’re building. We’ll show you how we’d approach it.

Start a Project