BEP authorship and information management for a new terminal in Riyadh
Back to Case Studies
AviationJul 2024

BEP 

Saudi Airports Authority (via Tier 1 Contractor)

120,000 m²Terminal area
47EIR requirements traced
100%On-programme information exchanges
0Non-conformances at Stage 4 gate

The Challenge

Author a procurement-ready BEP for a 120,000 m² terminal expansion that satisfied both the Saudi BIM mandate and the client's specific EIRs, then manage information delivery through Stage 4.

The Outcome

BEP accepted at first submission. Information exchanges completed on programme through Stage 4 with no non-conformances raised by the employer's information manager.

/Why They Needed Help

The 

/Scope of Work

What 

01EIR gap analysis and BEP authorship
02CDE setup and information management through Stage 4
03Model submission review and acceptance/rejection against BEP criteria
04ISO 19650 compliance documentation
05Stage gate submission package preparation
/Key Challenges

What 

Dual compliance

Contractor capability gap

/Our Strategy

How 

01

02

03

/Full Story

The 

The Saudi BIM mandate applies to all public infrastructure projects above a defined threshold. For a terminal expansion of this scale, compliance was non-negotiable — but compliance alone was not the brief.

The client's employer information requirements ran to 47 specific requirements across model quality, information exchange, and asset data delivery. Our brief was to author a BEP that traced every EIR requirement to a specific delivery commitment, then manage the information environment through to Stage 4.

The BEP authorship process started with a gap analysis: mapping the contractor's existing BIM capability against the EIR requirements to identify where additional resource or process change was needed.

The information management role through Stage 4 involved running the CDE as the gatekeeper for all model submissions, reviewing each submission against the BEP acceptance criteria before it was shared with the employer.

At Stage 4 gate, every EIR requirement had a documented evidence trail in the CDE, and the information manager sign-off was achieved on first submission.

/Deliverables

What 

/Tools Used

Technology 

Aconex
Autodesk Revit
Navisworks Manage
Microsoft Excel
“First-submission acceptance on a 47-requirement EIR is not common. The BEP Neutec authored gave our team a delivery framework they could actually follow, not just a compliance document.”

BIM Manager, Tier 1 Contractor

Client Representative

/Certifications

Audited 

Every engagement is delivered against certified management systems — not just claimed adherence.

Information Management certification

Information Management

BIM delivery

Quality Management certification

Quality Management

Process & delivery

Information Security certification

Information Security

Data handling

Environmental certification

Environmental

Sustainability

LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·

Have 

Tell us what you’re building. We’ll show you how we’d approach it.

Start a Project