
Back to Blog
Digital Engineering 9 minAug 2024
Scan-to-BIM accuracy: what tolerance actually means on a retrofit project.
Neutec Digital Engineering Team
"Sub-centimetre accuracy" means nothing without a tolerance standard attached to it. Here's how we define accuracy before the first scan is taken.
Questions to settle before the scanner arrives
- What tolerance the design team actually needs to work to.
- Which areas will be modelled, and which stay as point cloud only.
- How capture is phased around occupied or operational floors.
- The coordinate system the survey is georeferenced to.
- Where site verification remains advisable despite the scan.
N
Neutec Digital Engineering Team
Neutec · Aug 2024
/Certifications
Audited
Every engagement is delivered against certified management systems — not just claimed adherence.

Information Management
BIM delivery

Quality Management
Process & delivery

Information Security
Data handling

Environmental
Sustainability
LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·LET'S MODEL THE BUILT WORLD ·


